The highwall above this mine opening
shows signs of severe weathering


Highwall is covered with mesh to allow
the gunite to adhere securely


Preparing the gunite mix for loading
 into the silo and gunite machine


Adding the dry gunite mix to the silo
that feeds the gunite machine below


Spraying gunite on the highwall from
a basket about 50-70 feet in the air


Spraying from the top to the bottom from
a basket


Nearing the bottom of the highwall just
above the mine opening

 


Almost at the lowest point of the highwall
you can see the top of the mine opening

 


Spraying the hard to reach areas using
a spiralette nozzle to finish this area


 


Click the picture above to see a
gunite application video



(Broadband Internet connection recommended)


 

 

 

 