Home   About MARCO   More Information
Problems Explained
Pictures
Testimonials
Contact
Industrial
Chemical Grouting
Foundation Piering
Helix Anchor
Rock Fall Stabilization
Shotcrete/Gunite
Slabjacking
Slope Stabilization
Water Drainage
Magnum Piering
Special Projects


Major floods washed out the bridge
abutment.

 


Bridge was still structurally sound and
could be salvaged.

 


This bridge abutment has over 12 inches
of settlement localized on the left.

 


Walkway to apartment complex
shows structural deterioration.

 


Flooding and age have made this
bridge unsafe.


Floods have destroyed bridge
supports and wing walls.

SERVICES:

REFRACTORY     SHOTCRETE/GUNITE

TOP OF PAGE
Magnum Piering Authorized Dealer
© Copyright 2004, Marco Concrete Lifting
Powered By: Enterprise Wizards