Home   About MARCO   More Information
Problems Explained
Pictures
Testimonials
Contact
Industrial
Chemical Grouting
Foundation Piering
Helix Anchor
Rock Fall Stabilization
Shotcrete/Gunite
Slabjacking
Slope Stabilization
Water Drainage
Magnum Piering
Slope Stabilization
 


Natural fault line threatened rear
of home.

 


Driveway was completely lost to
landslide.

 


Pool area was located directly
above fault line.

 


What was once a landscaped side yard
had now dropped over 6 feet.

 


Concrete slab is actually driveway
from above.

 


Efforts to pull drain water away from
soil were ineffective.

 



Helix anchors are installed deep into the
soil to help stabilize the earth and to hold
the wire mesh firmly in place.

 


The wire mesh is installed.


 


Shotcrete is applied over the Helix and
wire mesh for maximum stability.


The finished slope with Helix, wire mesh
installed and shotcrete applied.


 

TOP OF PAGE
Magnum Piering Authorized Dealer
© Copyright 2004, Marco Concrete Lifting
Powered By: Enterprise Wizards