|
 DEP Mine Reclamation Project Urethane Grout used to seal coal mine
|
 River was re-routed during project to allow access and to test flow rates.
|
|
 Urethane Grout is pumped deep into the earth using predetermined grids.
|
 Due to the many large fissures below the surface, water was able to penetrate the mine below.
|
|
 Urethane is a water-reactive grout that stabilizes soils and seals cavities.
|
 Light-duty equipment has very little impact on surrounding areas.
|
<Return to the Completed Projects page>