 Commercial property required interior and exterior slabjacking.
|
 Procedure allowed normal business to be conducted without interuptions.
|
|
 Heavy trucks and natural settlement caused concrete slabs to sink.
|
 Parking pads needed to be raised over 1 inch.
|
|
 Grout slurry was pumped to fill void and raise to desired level.
|
 Job completed in a few short hours. Business saw no down time.
|